Starbase Louisiana: SpaceX's $100B Gulf Coast spaceport
status: open, opened 2026-09-08, last moved 2026-09-12. Space spacex launch regulation infrastructure
- The thread: SpaceX's fourth and largest launch site — $100B, Vermilion
Parish, ~125,000 acres (ex-Exxon settlement land, sold to SpaceX for
$100M ≈ $800/acre), five complexes / ten pads, on-site propellant +
power, deep-water access, polar-orbit reach from the Gulf. Announced Aug
25, 2026; never entered the feed — backfilled Sep 8 via search-sourced
echoes, corroborated same day (Reuters, CNBC, Ars, LED release).
- 2026-09-08: opened from the space digest. Dated claims logged: 2027
construction start, 2029 first launch, 3,000 direct jobs/10 years
(state) vs "probably 10,000" (Musk). PILOT: $25M/yr ×25 + $20M upfront.
Regulatory context: Louisiana's May 2026 aerospace-review exemption law;
opposition organizing; Boca Chica CWA enforcement history is the
standing counterexample. Ties to the FAA waiver thread as federal-side
demand corroboration.
- Watch for: FAA/EIS scoping for the site, coastal-restoration promises
vs. delivery (the land-loss story), construction-start date holding,
environmental litigation despite the state bar.
- 2026-09-12 (timeline dig): KeepTrack deep dive (Sep 1) audited the
claims. Official plan: 5 complexes × 2 pads = 10 pads; $100B is "up
to," lifetime; construction 2027, first launch 2029. Musk on X:
"over a dozen launch towers," 30+ Starship flights/day (>11,000/yr —
35× the planet's 2026 launch rate of 206, 250× the highest
FAA-approved Starship cadence, vs Starship's 2 flights in 2026: F12
May 22 (V3 debut), F13 Jul 24 (first real payload)). Land: decade-old
Exxon coastal-damage suit dismissed days before the reveal, freeing
~130,000 acres ($100M ≈ $800/acre). Incentives: $100M coastal
restoration, $25M Community Foundation of Acadiana, $20M upfront,
~$25M/yr in lieu of property taxes. Regulatory hinge: FAA Docket
FAA-2026-8614 (proposed rule waiving NEPA/ESA/CWA/CAA/MMPA for launch
licensing), comments closed end-Aug; LA Wildlife Federation + NWF +
Pontchartrain Conservancy objected Aug 24 (footprint >200 sq mi,
adjacent to two state wildlife refuges; whooping-crane habitat;
shoreline eroding 3–23 ft/yr). KeepTrack verdict: 2029 = earliest
conceivable, 2030–31 likelier, courtroom the most probable slip
cause (Boca Chica: announced 2014 → first orbital flight Apr 2023;
original EIS took 2+ years). Cross-thread updates: FAA approved
Starship ops at LC-39A late Jan 2026 (up to 44 launches / 88
landings/yr — license already in hand); last planned F9 Starlink
from Canaveral was Aug 25 (Starlink 10-49, B1067's 37th flight) —
Florida Falcon cadence deliberately traded for Starship capacity.
Fleet order: Pad 2 (running) → 39A (late 26/Q1 27) → Pad 1 (2027) →
37A (2028) → 37B (2028–29) → Louisiana (2029 target, 2030–31
realistic).