Tickline News

The restart/finish wave, with a wobble: Palisades fuel-load pause, Crane cleared (Sep 24–29)

Energy

From the Energy digest for Oct 2, 2026

Sources ANS/Palisades WNN/Holtec SMR site work WNN/IPO ANS/NRC roundup WNN/Crane WNN/Hamaoka

What's genuinely new: Palisades' pause is the first operational incident reported in the U.S. restart wave — the story to watch is resumption timing and the cause's taxonomy (assemblies vs. procedure).

Previous: TerraPower loses its EPC: Bechtel exits Natrium (Sep 21–22)

Next: Fuel-cycle buildout: two enrichment bets on Paducah, TRISO-X walls up, HALEU stacking (Sep 14–29)