STEP: the UK prototype fusion plant opens its first system contracts
Where it stands: UK Fusion Energy, a UK Atomic Energy Authority subsidiary, has opened a tender for five engineering contracts worth up to £115 million for its STEP prototype fusion plant at West Burton, covering breeder blanket, fuel cycle, test operations, plant control systems, and systems engineering and integration. Tenders are due January 29, 2027, with awards expected April 6 and contracts starting April 23, 2027. The target is predictable net electricity above 100 MW from a prototype operating by 2040; watch the April award decisions.
Latest
- UK Fusion Energy, the UK Atomic Energy Authority subsidiary building the Spherical Tokamak for Energy Production at West Burton, opened a tender for five engineering contracts worth up to £115 million (about US$152 million): breeder blanket (£20M), fuel cycle (£20M), test operations (£35M), plant control systems (£15M), systems engineering and whole-plant integration (£25M). Each lot runs two years extendable to a maximum of four, and one supplier may take at most three lots (WNN — world-nuclear-news.org/articles). Tenders are due January 29, 2027, award decisions are expected April 6, and contracts begin April 23, 2027. The March ILIOS consortium appointment (£200 million, about US$267 million, the first three-year tranche) covers site design and build; the target is predictable net electricity above 100 MW from a prototype plant operating by 2040. Watch: the April 2027 award decisions, and how the five system partners sit alongside ILIOS's works.